桩22
2017-04-05 13:14:39 0 举报
施工
作者其他创作
大纲/内容
check the hole into the pile
N
check the reference point of pile
pile arrangement parameters
definite pile location
rear reinforcement cage
pile foundation inspection
Y
check the projected depth of pile
check the verticality of steelcage
check concrete wrapped dill bit
is the pile foundation checked
design of pile composite found ation
Pile foundation design
pile foundation
end
checking the beaing capacity of pile foundation
Start
bearing capatity of testing pile composite foundation
drill pile go down
survey
pile completion
pumping concrete on drill pile
check the distance between survery points and exploration depth
pore porming pile
0 条评论
下一页
为你推荐
查看更多