00. Project Concept Stage
01. Concept
Objectives
To confirm and to quantify the scope of work for the propose of producing an accurate engineering proposal
To engineer and provide concept proposal to clients in consultancy work
Tasks
Concept Study/Development
Review all information received from client
Quantify main building elements
Building structure
Building foundation
staircase
Platform
Connectors and connections
Quantify modular elements
Modular structure
Temporary structural bracing
Identify the necessity and complexity of structural analysis
Whole building structural analysis
Modular structure analysis
CSC analysis
(Consultancy) Provide concept proposal
Briefing external Architect
Concept description
Features of modular design
Coordinate with PM and team member to refine concept proposal
Receive and review external Architect's concept
Provide concept to client
RFI
Confirm any structure related enquiries
Structural analysis required?
General structural analysis approach
Structure feasibility
General feedback to client might be required
To help reduce project uncertainties and complexity in the earliest stage
02. Engineering Proposal
Objectives
To produce an accurate project engineering proposal based on the information obtained in stage 01, the engineering proposal should include specific tasks that reflects the characteristics and complexity of the project.
Tasks
Breakdown tasks/output in engineering proposal
Assign appropriate time needed for each tasks
Coordinate with team members and PM to refine the engineering proposal
Coordinate with external engineers to refine the engineering proposal
10. Pre-Engineering Stage
11. Project Study
Objectives
A thorough study of all project documents to fully understand the project's contents and to acquire all necessary building information in order to start the project.
Tasks
Kick-off meeting
Project study
Review new information received
General RFI feedback from client
Specific information collecting
Project location
Building category
Soil property
RFI
Confirm all remaining structure related enquiries
12. BEP
Objectives
Planning and organisation of effective collaboration of all design team members at all stages of BIM project
Task
Define and document the following aspects
Project details
Project description
Project Name, code and abbreviation
Revit files organisation
Revit template
Revit design options (types)
Project orientation
Project base point
General grid and level
LOD
BIM output
3D model
2D drawing set
BOM
BIM strategy
Roles and responsibilities
Project-Specific EWP Breakdown
Communicate & Coordinate Design Process
File into WIP folder for each project
13. Research
Objectives
To acquire specific design information and analysis data/parameters
Tasks
Research topics
Design code
ANSI/AISC
Eurocode
GB
Parameters
Steel structural analysis
Design data
Structural parameters
Behaviour factor
Correction factor
Reliability Class
Interaction Factors
Framing system
System Overstrength Factor
Gravitational loads
Live loads
Floor loads
Roof load
Snow load
Rain load
Dead loads
Dynamic loads
Earthquake
Ground acceleration
Spectrum type
Ground type
Wind
Wind velocity
Terrain category
Orography factor
Turbulence factor
Structural factor
Air Density
CSC analysis
Stacking test
Lifting test
Longitudinal racking test
Transverse racking test
Material
Locally available structural materials
14. Calculation & Analysis
Objectives
Define and conduct all necessary calculation/analysis for the purpose of decision making in order to achieve the most optimal design solution.
Tasks
Module structure analysis
3D modelling
Steel design analysis
Capacity ratio
Deformation
CSC analysis
Stacking test
Lifting test
Longitudinal racking test
Transverse racking test
Building structure analysis
3D modelling
Steel design analysis
Capacity ratio
Deformation
Reports
15. 3D Model Development
Objectives
- Create 3D BIM models that comply with XCUBE BIM standard
- Create 3D models that deliver solid solution/product to the client
- Coordinate with other disciplines/departments to eliminate design errors and collisions
- Create 3D models that deliver solid solution/product to the client
- Coordinate with other disciplines/departments to eliminate design errors and collisions
Tasks
Modular element modelling
Module structure
Architectural Openings
MEP openings
Connections
Temporary bracing
Building element modelling
Building structure
Platform structure
Walkway structure
Staircase structure
Connectors & connections
Foundation
Project-based revit families
Coordination and Collision Check
16. 2D Drawing Set
Objectives
- Produce 2D drawing set that complies with XCUBE drawing standard
- Produce 2D drawing set that fulfills pre-engineering targets
- Produce 2D drawing set that fulfills pre-engineering targets
Tasks
Building elements to be presented
Module structure
Building structure
Platform structure
Walkway structure
Staircase structure
Connectors & connections
Foundation
Drawing list for each building elements
Cover page
General Information
3D views
General layout
Top view
Floor plan
Elevations
Front/Rear
Left/Right
Sections
Longitudinal sections
Transverse sections
Details
17. Pre-Engineering Documents
Objectives
To provide all necessary pre-engineering documents
Tasks
Documents
Pre-Engineering presentation
Materials
Structural analysis report
18. Review & Revisions
Objectives
To review all drawing sets produced and make necessary revisions if required
Tasks
Design review
Calculations
3D Model
Equipment
To do list
Materials
To do list
Collisions
2D Drawings
Drawing Standard
Meetings
Design revision
20. Detail-Engineering Stage
21. Pre-Engineering Feedback Study
Objectives
To study and produce work scheduling for Detail-engineering stage
Tasks
Feedback study and coordination with team members to address all design issues and changes
Scheduling of work to be carried out in detail-engineering stage
22. 3D Model Update
Objectives
- Modify 3D models and develop the models to the required LOD
- Modify and improve 3D models according to the requirements
- Coordinate with other disciplines/departments to eliminate design errors and collisions
- Modify and improve 3D models according to the requirements
- Coordinate with other disciplines/departments to eliminate design errors and collisions
Tasks
Modular element modelling
Module structure
Architectural Openings
MEP openings
Connections
Temporary bracing
Building element modelling
Building structure
Platform structure
Walkway structure
Staircase structure
Connectors & connections
Foundation
Project-based revit families
Coordination and Collision Check
23. 2D Drawing Set
Objectives
- Produce 2D drawing set that complies with XCUBE drawing standard
- Produce 2D drawing set that fulfills detail-engineering targets
- Produce 2D drawing set that fulfills detail-engineering targets
Tasks
Building elements to be presented
Module structure
Building structure
Platform structure
Walkway structure
Staircase structure
Connectors & connections
Foundation
Drawing list for each building elements
Cover page
General Information
3D views
General layout
Top view
Floor plan
Elevations
Front/Rear
Left/Right
Sections
Longitudinal sections
Transverse sections
Details
Material list
24. Detail-Engineering Documents
Objectives
To provide all necessary detail-engineering documents
Tasks
Documents
General description
Material proposal & sourcing
BOQ
25. Review & Revisions
Objectives
To review all drawing sets produced and make necessary revisions if required
Tasks
Design review
Calculations
3D Model
Equipment
To do list
Materials
To do list
Collisions
2D Drawings
Drawing Standard
BOM
Meetings
Design revision
30. Prefabrication, Delivery and Installation Stage
31. Manufacture Drawing Set
Structure Breakdown
Installation Sequence
Code Name
Modulated system
Material
Steel Grade
Steel Type
Surface finishing
BOM
Connection
Welding
Welding specification
Welding type
Welding thinkness
Bolting
Bolting specification
Bolt type
Bolt grade
Bolt set
Bolt dimension
Tolerance
Installation tolerance
Bolt opening
Manufacture tolerance
32. Prefabrication & QC
Site QC & Accpetance
QC drawings
QC checking list
QC report
33. Packing & Delivery
Transportation and Delivery Planning
34. Site Installation
Setting out plan
Installation planning
Site supervision
35. As-Built Drawing Set
3D model update
2D drawing set update
36. Meetings, Review & Revisions
Meetings
Issues and solutions
QC database
37. Project Summary & Close Up
Collecting and archiving all documents